Projects Currently Being Realised – 1st July 2010

| Projects Performed - 01.07.2010 | |||||
|---|---|---|---|---|---|
| Project name | Co-financing | Project scope | Current progress of work | ||
![]() Operation 6.3-6 |
92.08 mln PLN (OPIE 6.3) |
max 50% | Expansion of the existing passenger terminal building | Pre-agreement signed | |
![]() Operation 6.3-7 |
87.68 mln PLN (OPIE 6.3) |
max 50% | 1. Building the taxiing route from the airplane parking area in the north-east part (link), with the accompanying infrastructure; (31.23 mln PLN) 2. Reconstruction of Alfa and Golf taxiing routes; (51.46 mln PLN) 3. Expansion of planes in the north-east part. (95 mln PLN) |
Pre-agreement signed. The first phase of the project started. | |
![]() Operation 6.3-15 Standby project |
171,37 mln PLN (OPIE 6.3) |
max 50% | 1. Reconstruction of the existing Passenger Terminal; (85 mln PLN) 2. Reconstruction of Bravo and Foxtrot taxiing routes; (76 mln PLN) 3. Take-off route repair. (180.5 mln PLN) |
Pre-agreement signed | |
![]() Operation 8.4 |
14,83 mln PLN (OPIE 8.4) |
85,00% | 1. Delivery of registered baggage check devices of standard III, and delivery of registered baggage check devices of standard II; 2. Delivery of personal baggage check devices and personal baggage re-check devices; 3. Delivery of gantry metal detectors of standard II; 4. Delivery, installation and start-up of biometric access control system for airport personnel in the terminal building; 5. Delivery, installation and start-up of 3 pieces of non-invasive passenger check devices. |
Co-financing agreement | |
![]() Operation 8.4 |
11,03 mln PLN (OPIE 8.4) |
85,00% | 1. Replacement of the existing fencing net with new panel fencing in the airport area; 2. Delivery and installation of mechanical barriers against gate forced entry; 3. Adjustment of the over-the-fence intrusion detection system to the modernised fencing protecting the airport area, and installation of an -the-fence intrusion detection system to protect the area where navigation lighting is installed, within the main direction 2.5, and the direction 0.7; 4. Delivery and installation of stationary and mobile components of the airport area security system; 5. Digitisation of the CCTV system; 6. Delivery and installation of the PPS monitoring system; 7. Delivery of a pyrotechnic robot with additional equipment. |
Co-financing agreement | |
![]() Operation 8.4 |
5,66 mln PLN (OPIE 8.4) |
85,00% | 1. Building of a gas connection for the Airport Fire/Rescue Unit Station; 2. Modernisation of the signalling and fire alarm system; 3. 3. Purchase of two fire-rescue vehicles for the Airport Fire/Rescue Unit; 4. Purchase of a technical rescue vehicle with environmental rescue function. |
Co-financing agreement | |
![]() Operation 8.4 |
5,54 mln PLN (OPIE 8.4) |
85,00% | l. Purchase of braking factor verification device; 2. Purchase of two snow removal sets; 3. Purchase of a compact cleaner; 4. Purchase of a snow cutter; 5. Purchase of a road sprinkler vehicle; 6. Purchase of a sanding vehicle. |
Co-financing agreement | |
![]() Operation 8.4 |
6,20 mln PLN (OPIE 8.4) |
53% | 1. Building and installation of an Ice-Alert system (construction works, delivery with installation and start-up). 2. Building of a PAPI (Precision Approach Path Indicator light system, the system of lighted vertical indicators with technical ducts and wells. 3. Expansion of the Airport Security Service station (including the cabling ducts, repositioning of the communication cabling and installation of structural network in the expanded Airport Security Service Station). 4. Building of a service road (patrol) along the airport fence, including cabling ducts. 5. Building of a Security Check Station – non-eligible cost.. |
Co-financing agreement | |
![]() |
20.72 mln PLN | 53.62% | The creation of an internal road - railway system reflecting the needs of the planned investments (including the development of the existing terminal, the construction of a multi-level parking lot, the construction of a hotel) as well as linking the airport's internal road system with the external system. | Pre-agreement signed | |
![]() |
2.39 mln EUR | 48,48% | Design works and studies about future investments (including: preparation of the airport expansion feasibility study, environmental impact report of the planned investments) and technical documentation concerning expansion of the airport infrastructure (including: signalling system, increasing the airport operational category, expansion of the taxiing routes and the airplane parking area, expansion of terminal, security/safety related infrastructure, administration and technical infrastructure). | Project in progress | |